| 192030 - STRUCTURE EXCAVATION (SLOPE PROTECTION) |
CY |
07 |
60 |
$300.00 |
$347.89 |
$18000.00 |
12-12-2024 |
07-348204 |
1 |
M |
TRO |
| 192030 - STRUCTURE EXCAVATION (SLOPE PROTECTION) |
CY |
07 |
60 |
$400.00 |
$463.85 |
$24000.00 |
12-12-2024 |
07-348204 |
2 |
M |
TRO |
| 192030 - STRUCTURE EXCAVATION (SLOPE PROTECTION) |
CY |
07 |
60 |
$137.00 |
$158.87 |
$8220.00 |
12-12-2024 |
07-348204 |
3 |
M |
TRO |
| 192030 - STRUCTURE EXCAVATION (SLOPE PROTECTION) |
CY |
07 |
60 |
$330.00 |
$382.68 |
$19800.00 |
12-12-2024 |
07-348204 |
4 |
M |
TRO |
| 192030 - STRUCTURE EXCAVATION (SLOPE PROTECTION) |
CY |
07 |
60 |
$275.00 |
$318.90 |
$16500.00 |
12-12-2024 |
07-348204 |
5 |
M |
TRO |
| 192030 - STRUCTURE EXCAVATION (SLOPE PROTECTION) |
CY |
07 |
60 |
$420.00 |
$487.04 |
$25200.00 |
12-12-2024 |
07-348204 |
6 |
M |
TRO |
| 192030 - STRUCTURE EXCAVATION (SLOPE PROTECTION) |
CY |
07 |
60 |
$226.00 |
$262.08 |
$13560.00 |
12-12-2024 |
07-348204 |
7 |
M |
TRO |