| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
40 |
$354.05 |
$410.57 |
$14162.00 |
11-13-2024 |
08-1J2704 |
1 |
M |
TRO |
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
40 |
$208.00 |
$241.20 |
$8320.00 |
11-13-2024 |
08-1J2704 |
2 |
M |
TRO |
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
40 |
$180.00 |
$208.73 |
$7200.00 |
11-13-2024 |
08-1J2704 |
3 |
M |
TRO |
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
40 |
$250.00 |
$289.91 |
$10000.00 |
11-13-2024 |
08-1J2704 |
4 |
M |
TRO |
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
5804 |
$65.00 |
$75.38 |
$377260.00 |
12-05-2024 |
08-1J7204 |
1 |
M |
TRO |
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
5804 |
$41.50 |
$48.12 |
$240866.00 |
12-05-2024 |
08-1J7204 |
2 |
M |
TRO |
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
5804 |
$48.00 |
$55.66 |
$278592.00 |
12-05-2024 |
08-1J7204 |
3 |
M |
TRO |